Full fill Solar energy service
Solar cell installation
We as the leader in renewable energy have intend to industry sector has been using clean
energy from a technology and products efficiently, and the most sustainable, for environment which better and business growth by participation of everyone. we are ready to be the part of creating renewable energy for your organization by full fill green energy services
EPC Solar cell
We are a solar energy service for the industry sector, you can produce electricity all time by yourself, it means to reduce electricity. We attach importance to the quality of products and services, include to investment benefits and return on investment within a short time


Solution defined
Expert guidance & continued support from our installation team

Financing
dealing with Bank, BOI for your business solution

Contact for permission
Comprehensive supervision of permission documents

High Quality Product
High-quality solar panel
,inverter etc.

O&M warranty
Check the equipment after installation with modern equipment.
Why your choose ENERGY GREEN PLUS+ ?
Full fill solar cell service, We are more than installer
We can offer an investment solution for the installation of a solar cell system This will be done in accordance with the policy of the Office of the Board of Investment (BOI).
Tax incentive (BOI)
Financing solution consultant
(FAQ)
How does the solar cell system save energy?
The solar cell system will start generating electricity from the morning. (7:00 a.m. – 10:00 a.m.) where the efficiency of electricity generation will continue to increase. during the day to often (12:00 p.m.-3:00 p.m.), allowing us to use electricity for free during this time. Reduce work in the evening (18:00) in the case of electricity from the solar cell system. not enough for the use of electrical appliances the system will draw electricity in the normal system or the power supply from the power plant to be used instead.
In 1 day, how long can a solar cell system produce electricity?
On average, in 1 day, the solar cell system can produce about 4.5-5 hours of electricity per day. by electricity depending on the sunlight each day
The solar cell system is suitable for installation on any location ?
Suitable for all places that use a lot of electricity during the day. Whether it’s a house, an office, but the most suitable is an industrial plant which has a high amount of electricity And there is a lot of roof space for installing solar panels.
Solar cell system How many years of use?
Solar panels have an average lifespan of 25-30 years, while inverters have an average lifespan of 20 years, depending on the type. and the quality of the equipment. (But ours will introduce international quality equipment. which can be used for a long time)
Which direction should the solar panel face?
Installation of solar panels in Thailand should face south because the south is the destination where sunlight will travel from always east causing the south to receive sunlight all day and in a good way The solar panel should be tilted about 15 degrees in order for the panel to receive sunlight and generate electricity fully.
Solar cell system How much is the return? Payback within how many years?
As we already know We can use free electricity from solar cells on average 4.5-5 hours a day, so if we have a lot of electricity use 6-7 days a week. It will help us get high returns accordingly.That is to say, the more electricity is used during the day every day. It’s even more worthwhile. The average rate of return on investment will be 22% per year, so the investment can be returned within a period of only 4-5 years.
Investing in installing a solar system the investment can be returned within 2-3 years, right?
Due to the installation of solar cell systems for the industry receive tax privileges from the BOI, which can reduce corporate income tax by 50% of the investment, therefore making the capital return faster, only 2-3 years. Consult about BOI tax privileges, including applying for a license for free!
To install a solar cell system which agencies do I need to apply for permission? And what are the steps?
Electricity sales applicants who have already been selected by the MEA or PEA can apply for permission to install solar cell systems according to the law, including: 1. Application for a building modification permit (Aor. 1) 2. Application Apply for a license to operate an electric power plant (Ror Ngor. 4) and when the installation is complete, permission must be obtained: 1. Applying for a license to produce regulated energy (Por Kor 2). exempt
If you don't want to invest by affecting your cash flow, Energy Green Plus+ is there a source of funds for installing solar cells or not?
Energy Green Plus+ can provide funding. available from many financial institutions which helps to invest in solar cell systems does not affect cash flow
Solar cell system How is it important in the Thai context?
Thailand has intense sunlight. Therefore, solar energy is very suitable for use. Including electricity costs tend to increase continuously. Free use of electricity from the solar system Therefore, it is a new alternative for saving electricity. In addition, in terms of export operators is about to meet measures to adjust the carbon tax before crossing the border to make the manufacturer who has produced the product With the process carbon emissions are taxed.

ENERGY GREEN PLUS+
We believe that all companies need to save energy to reduce ROI and better save the environment together
Services
Solar cell installation
Tax incentive (BOI)
Financial solution
Operation&Maintenance
Contact
Energy Green Plus Co.,Ltd. 455/37-38 Rama 6 Rd., Ratchathewi, Banagkok 10400
E-mail : [email protected]
Tel : 087-439-5555
Tel : 02-219-2697
Tel : 02-613-8312
Line : @energygreenplus

Social media